Faculty of Engineering and Mathematical Sciences 
Not logged in (login)

help5501

This forum is provided to promote discussion amongst students enrolled in CITS5501 Software Testing and Quality Assurance.

Before posting a question here, you might like to (1) search the forum for previous posts asking the same question, and (2) read the article How To Ask Questions The Smart Way .
And please keep the discussion civil (as required by UWA's Computer Use Policy, #9).
 

Options:
RSS cloud
Jump to:

Project Test Fixtures

3 of 124 articles shown, currently no other people reading this forum.
photo
From: Benjamin L.
Date: Fri 22nd May 2020, 2:41pm
Actions: 
        Login-to-reply

 

Does question 1b require us to give 2 separate test fixtures for 
finalizeContract, or 2 components that would be in a test fixture for the 
method?

Project Test Fixtures

photo
From: Arran S.
Date: Fri 22nd May 2020, 2:58pm
Actions: 
        Login-to-reply

 

Hi Benjamin,

For the purposes of this question, you can just interpret "an example of a test fixture" 
as being "one variable that would be stored as an instance variable in a test class". So 
if you can give examples of two such variables, then that's enough.

Does that clarify the question sufficiently? If not, let me know, and I'll see if I can 
re-word the project spec to make things less ambiguous.

cheers

Arran

"Benjamin Longbottom" <22*3*7*[email protected]*u*e*t*u*a*e*u*a*> wrote:

> Does question 1b require us to give 2 separate test fixtures for 
> finalizeContract, or 2 components that would be in a test fixture for the 
> method?

Project Test Fixtures

photo
From: Benjamin L.  O.P.
Date: Fri 22nd May 2020, 3:52pm
Actions: 
        Login-to-reply

 

Ok cool that answers my question thanks Arran
This Page


Program written by: [email protected]
Feedback welcome
Last modified: 11:27am Sep 21 2020